| Patok | DN | Aspal | Beton | Tanah | Syphon | Total HDPE | GI Jembatan | Total Segmen | Dikerjakan | Sisa |
|---|---|---|---|---|---|---|---|---|---|---|
| P0-P1 | 50 |
112 /
988 Sisa: 876 m (11.34%) |
0 /
9 Sisa: 9 m (0%) |
0 /
9 Sisa: 9 m (0%) |
9 | 1015 | 9 | 1024 | 112 | 912 |
| P1-P2 | 100 |
0 /
10 Sisa: 10 m (0%) |
0 /
10 Sisa: 10 m (0%) |
0 /
10 Sisa: 10 m (0%) |
10 | 40 | 10 | 50 | 0 | 50 |
| DN | Aspal | Beton | Tanah | Syphon | Total HDPE | GI Jembatan | Total Segmen | Dikerjakan | Sisa |
|---|---|---|---|---|---|---|---|---|---|
| 50 | 1976 | 18 | 18 | 18 | 2030 | 18 | 2048 | 112 | 1936 |
| 100 | 20 | 20 | 20 | 20 | 80 | 20 | 100 | 0 | 100 |