Monitoring: hh

Total Panjang

1074 m

Total Dikerjakan

112 m

Sisa

962 m

Aspal
112/1996 m
Beton
0/38 m
Tanah
0/38 m
Syphon
38 m
Monitoring Per Patok
Patok DN Aspal Beton Tanah Syphon Total HDPE GI Jembatan Total Segmen Dikerjakan Sisa
P0-P1 50 112 / 988
Sisa: 876 m (11.34%)
0 / 9
Sisa: 9 m (0%)
0 / 9
Sisa: 9 m (0%)
9 1015 9 1024 112 912
P1-P2 100 0 / 10
Sisa: 10 m (0%)
0 / 10
Sisa: 10 m (0%)
0 / 10
Sisa: 10 m (0%)
10 40 10 50 0 50
Rekap Berdasarkan DN
DN AspalBetonTanahSyphon Total HDPEGI JembatanTotal Segmen DikerjakanSisa
50 1976 18 18 18 2030 18 2048 112 1936
100 20 20 20 20 80 20 100 0 100
Input Laporan Arsip Laporan Kembali