Monitoring: f0

Total Panjang

1373 m

Total Dikerjakan

567 m

Sisa

806 m

Aspal
207/198 m
Beton
175/500 m
Tanah
185/1920 m
Syphon
96 m
Monitoring Per Patok
Patok DN Aspal Beton Tanah Syphon Total HDPE GI Jembatan Total Segmen Dikerjakan Sisa
P0-P1 50 156 / 90
Sisa: -66 m (173.33%)
124 / 190
Sisa: 66 m (65.26%)
134 / 880
Sisa: 746 m (15.23%)
40 1200 7 1207 414 793
P1-P2 100 51 / 9
Sisa: -42 m (566.67%)
51 / 60
Sisa: 9 m (85%)
51 / 80
Sisa: 29 m (63.75%)
8 157 9 166 153 13
Rekap Berdasarkan DN
DN AspalBetonTanahSyphon Total HDPEGI JembatanTotal Segmen DikerjakanSisa
50 180 380 1760 80 2400 14 2414 414 2000
100 18 120 160 16 314 18 332 153 179