| No | Patok | DN | HDPE (meter) | Total HDPE | GI Jembatan | Total Segmen | |||
|---|---|---|---|---|---|---|---|---|---|
| Aspal | Beton | Tanah | Syphon | ||||||
| 1 | P0-P1 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2 | P1-P2 | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 3 | P1-P3 | 50 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 4 | P1-P4 | 50 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| TOTAL | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
| DN | HDPE (meter) | GI Jembatan |
|---|---|---|
| 50 | 0 | 0 |
| 100 | 0 | 0 |